Description:According to operating room arrangements of big hospitals at home
and abroad, our company can design the most reasonable arrangement
diagram of purified operating room, which can meet with doctors’
and nurses’ requirements on operation, as well as accord with the
ration of the purified airflow organization, to make it be the
modern and perfect operation room in 21th Century. The purified
delivery tuyere is applied with good quality and high efficiency
purified filter, stain stell frame, air delivery surface, as well
as with illumination system. The illumination range is
500LUX1500LUX. Non shadow lamps are provided. The Hanging-tower
installation frame also can be equipped.
Technique index:
| Purification class | Names | Air delivery ways | Dimension of delivery tuyere | The average air speed of the working area section m/s | Air changing times /h | The minimal volume of the fresh air |
| Width mm | Length mm |
| I(100) | Specially clean operation room | Concentrate partially | 2400 | 2600 | 0.25-0.30 | - | 1000 |
| II(1000) | Standard clean operation room | Concentrate partially | 1800 | 2600 | - | 30-36 | 800 |
| III(10000) | Common operation room | Concentrate partially | 1400 | 2600 | - | 20-24 | 800 |
Table 1 standard recommended by operating room Environment
Committee of United States Surgical Society
| Class of operating room | Suspended bacterial concentration allowed | Appreciation situation |
| Ⅰ class | 35m3(1 /ft3) | Clean operation (manual organ transplant) |
| Ⅱ class | 175m3(5 /ft3) | Clean operation |
| Ⅲclass | 700m3(20 /ft3) | Common operation |
The main structure
1.Can apply the aluminum plastic board, the quality is rather ideal
.
2.The common type can apply sandwich color steel partitions; low
cost and good quality; choice with green and grey white.
3.The high class type can apply static & paint spraying &
zinc plating steel board; variety of colors, hard material, the
life span is more than 20 years.
Air conditioner system:
1.The big operation room with more than 10 rooms should apply the
central air conditioner, but the conditioner should keep working
for 12 months.
2.The middle and small operation room with less than 10 rooms
should apply small separated conditioners ( e.g. apply big gold air
pipe machine set), which can make sure that each operation room is
able to precisely control temperature and control the switches to
save energy.